The Serbian branch was established in March 2017 in Belgrade. The branch is specialized in:

  • construction, reconstruction and maintenance of tracks,
  • electrification,
  • signalling.

History of the subsidiary

The branch was founded after winning the project of reconstruction of Slavija Square, Bulevar Oslobođenja and Ruzveltova street. It was first 5.5 km of tramway tracks Colas Rail did in Serbia. Since then, the branch has been an active contractor on railway and tramway projects in Serbia.

Presentation

Two teams operate in the branch. One for tramway lines and the other  for railways. In the last two years Serbia branch is main contractor on all on tramway project  in Belgrade, Serbia.

The branch is equipped with:

  • two tamping machines for plain line and turnouts,
  • ballast regulator,
  • two portal cranes,
  • ballast cleaning machine,
  • two railroad excavators, which will be used in railway projects across Serbia.

Major projects

Localization

Ogranak Colas Rail SA Beograd
Bulevar vojvode Bojovića 6-8
11 000 Belgrade – Serbia

Contact

info-rs@colasrail.com


 

U Srbiji Ogranak Colas Rail SA Beograd osnovan je u Martu 2017. Specijalizovani smo u području:

  • Izgradnje i održavanja koloseka
  • Elektrifikacije
  • Signalizacije

Povijest ogranka

Ogranak je osnovan nakon dobijanja projekta Trg Slavija, Bulevar Oslobođenja i Ruzveltova ulica. To je bilo prvih 5.5 kilometara tramvajske pruge koje je Colas Rail napravio u Srbiji. Od tada ogranak je aktivni izvođač tramvajskih i železničkih projekata u Srbiji.

Prezentacija

Dva tima deluju u ogranku. Tim za tramvajske linije i tim koji je zadužen za železnice. U poslednje dve godine ogranak je glavni izvođač radova na većini tramvajskih projekata u Beogradu, Srbiji.

Ogranak je opremljen sa:

  • Dve podbijačice za skretnice i koloseke
  • Profilkom
  • Dva portalna krana
  • Rešetalicom
  • Dva dvoputa železnička bagera

Glavni projekti

„Most na Adi“ – završen 5 Jula 2019

Izgradnja nove elektrificirane dvostruke tramvajske pruge preko poznatog beogradskog mosta, kojom smo povezali stari deo grada sa Novim Beogradom.

Područije radova obuhvatalo je izgradnju:

  • Dvostruke tramvajske linije 5.8 km
  • Povezivanje s postojećom tramvajskom mrežom 1.6km
  • Izgradnja jedne nove i rekonstrukcija postojeće ispravljačke stanice
  • Instalacija dve tramvajske stanice

 

Trenutačni projekti:

  • Obnova železničke pruge Jajinci-Mala Krsna
  • Urbani tramvajski projekat Zeleni Bulevar
  • Modernizacija Tehničko Putničke Stanice Zemun