The Serbian branch was established in March 2017. in Belgrade. The branch is specialized in construction, reconstruction and maintenance of tracks, electrification and signalling.

History of the subsidiary

The branch was founded after winning the project of reconstruction of Slavija Square, Bulevar Oslobođenja and Ruzveltova street. It was first 5.5 km of tramway tracks Colas Rail did in Serbia. Since then, the branch has been an active contractor on railway and tramway projects in Serbia.

Presentation

Two teams operate in the branch. One for tramway lines and the other  for railways. In the last two years Serbia branch is main contractor on all on tramway project  in Belgrade, Serbia. The branch is equipped with two tamping machines for plain line and turnouts, ballast regulator, two portal cranes, ballast cleaning machine and two railroad excavators, which will be used in railway projects across Serbia.

Major projects

The second project in Serbia was “Ada bridge”, construction of a new electrified double tramway line across the famous cable-stayed bridge of Belgrade. The importance of this project was as well in building a new link between Belgrade and New Belgrade. Scope of works included construction of double tramway line 5.8km, connection to the existing tram network 1.6km,  construction of one new and reconstruction of an existing  rectifier stations and installation of two tramway stations. After 14 months of works, the tramway line was opened on the 5th of July 2019.

At this moment in Serbia there are three ongoing projects of railway line Jajinci-Mala Krsna, urban project Belgrade Green Boulevard and modernization of Technical Passenger Station Zemun.

Localization

Ogranak Colas Rail SA Beograd
Bulevar vojvode Bojovića 6-8
11 000 Belgrade – Serbia

Contact

U Srbiji Ogranak Colas Rail SA Beograd osnovan je u Martu 2017. godine. Ogranak je specijalizovan za  izgradnju, održavanje i rekonstrukciju železničkih pruga, elektrifikaciju  i signalizaciju.

Povijest ogranka

Ogranak je osnovan nakon dobijanja projekta Trg Slavija, Bulevar Oslobođenja i Ruzveltova ulica. To je bilo prvih 5.5 kilometara tramvajske pruge koje je Colas Rail napravio u Srbiji. Od tada ogranak je aktivni izvođač tramvajskih i železničkih projekata u Srbiji.

Prezentacija

Dva tima deluju u ogranku. Tim za tramvajske linije i tim koji je zadužen za železnice. U poslednje dve godine ogranak je glavni izvođač radova na većini tramvajskih projekata u Beogradu, Srbiji. Ogranak je opremljen sa dve podbijačice za skretnice i koloseke, profilkom, dva portalna krana,rešetalicom  i dva dvoputa železnička bagera. Sve mašine će biti korišćene na železničkim projektima u Srbiji.

Glavni projekti

Drugi projekat u Srbiji bio je „Most na Adi“, izgradnja nove elektrificirane dvostruke tramvajske pruge preko poznatog beogradskog mosta. Takođe, važnost ovog projekta je  spajanje starog dela grada sa Novim Beogradom. Područije radova obuhvatalo je izgradnju dvostruke tramvajske linije 5.8 km, povezivanje s postojećom tramvajskom mrežom 1.6km, izgradnja jedne nove i rekonstrukcija već postojeće ispravljačke stanice i instalacija dve tramvajske stanice. Nakon 14 meseci radova, tramvajska linija otvorena je 5 Jula 2019.

Trenutno u Srbiji se izvode dva železnička projekta Jajinci – Mala Krsna i  modernizacija Tehničko Putničke Stanice Zemun i  urbani tramvajski projekat Green Bulevard.

Localisation

Ogranak Colas Rail SA Beograd
Bulevar vojvode Bojovića 6-8
11 000 Belgrade – Serbia

Kontakt