- Lot 6: high-voltage equipment and the equipment for a maintenance depot.
- Lot 7: electro-mechanical works, the ventilation/smoke extraction system in the tunnel and the stations, air conditioning, fire protection and detection, escalators and lifts and the water pumping system.
- Lot 8: track works.
Key Figures
km of lines
Built stations