The Serbian branch was established in March 2017 in Belgrade. The branch specialises in:
- track construction, reconstruction and maintenance
- electrification
- signals
The Serbian branch was established in March 2017 in Belgrade. The branch specialises in:
The branch was established after being awarded a project for the reconstruction of Slavija Square, Bulevar Oslobođenja and Ruzveltova street. This was for the first 5.5 km section of tramlines constructed by the company in Serbia.
Since then, the branch has been an active contractor on railway and tramline projects in Serbia.
Two teams operate in the branch, one for tramlines and the other for railways. In the last two years the Serbia branch was the main contractor on all on tramline projects in Belgrade.
The branch is equipped with:
Construction of a new electrified double tramway line on Belgrade's famous cable-stayed bridge.
The importance of this project was also to establish a new link between Belgrade and New Belgrade.
Key figures: 8.5 km of overhead contact lines, 18 points & 9 level crossings
Reconstruction of the tramline on Slavija Square, Osobodjenja boulevard (from Slavjia Square to the Faculty of Veterinary Medicine) and Ruzveltovaand and Mije Kovacica streets. The project also includes overhead contact lines, roads, pavement structures, pavements and infrastructure works.
Key figures: 5.5 km of tram line, 7.5 km overhead contact lines and 15 points
Ogranak Colas Rail SA Beograd
Bulevar vojvode Bojovića 6-8
11 000 Belgrade, Serbia
U Srbiji Ogranak Colas Rail SA Beograd osnovan je u Martu 2017. godine. Specijalizovani smo u području:
Izgradnje i održavanja koloseka
Elektrifikacije
Signalizacije
Dva tima deluju u ogranku. Tim za tramvajske linije i tim koji je zadužen za železnice. U poslednje dve godine ogranak je glavni izvođač radova na većini tramvajskih projekata u Beogradu, Srbiji.
Ogranak je opremljen sa:
Dve podbijačice za skretnice i koloseke
Profilkom
Dva portalna krana
Rešetalicom
Dva dvoputa železnička bagera
Ogranak je osnovan nakon dobijanja projekta Trg Slavija, Bulevar Oslobođenja i Ruzveltova ulica. To je bilo prvih 5.5 kilometara tramvajske pruge koje je Colas Rail napravio u Srbiji. Od tada ogranak je aktivni izvođač tramvajskih i železničkih projekata u Srbiji.
Dva tima deluju u ogranku. Tim za tramvajske linije i tim koji je zadužen za železnice. U poslednje dve godine ogranak je glavni izvođač radova na većini tramvajskih projekata u Beogradu, Srbiji. Ogranak je opremljen sa dve podbijačice za skretnice i koloseke, profilkom, dva portalna krana,rešetalicom i dva dvoputa železnička bagera. Sve mašine će biti korišćene na železničkim projektima u Srbiji.
Izgradnja nove elektrificirane dvostruke tramvajske pruge preko poznatog beogradskog mosta, kojom smo povezali stari deo grada sa Novim Beogradom. Područije radova obuhvatalo je izgradnju: Dvostruke tramvajske linije 5.8 km, Povezivanje s postojećom tramvajskom mrežom 1.6km, Izgradnja jedne nove i rekonstrukcija postojeće ispravljačke stanice, Instalacija dve tramvajske stanice
Ogranak Colas Rail SA Beograd
Bulevar vojvode Bojovića 6-8
11 000 Belgrade – Serbia
Railway training Campus
Workshops and Network Engineering
Colas Rail website in the United Kingdom
Colas Rail website in Poland
Colas Rail website in Italy
Elektroline website in the Czech Republic
Kummler Matter website in Switzerland
Hasselmann website in Germany