Para una experiencia de navegación óptima, utilice Chrome, Firefox o Edge

The Bordeaux Tramway

In detail

Location

Bordeaux

Bordeaux phase 3 – RMS network renewal: Total turnover = €1,096,152 (pre-tax)
CR share = €831,078
After a decade of participating in the construction of Bordeaux’s different tram lines, recently won a contract covering the Overhead Contact Line and to renew the RMS (low-voltage) network, with a change in Asynchronous Transfer Mode technology towards Ethernet.